Interzinc B. Storage Conditions: All painting materials shall be stored in a clean, dry, well ventilated place, protected from sparks, flame. A three component, metallic, zinc rich epoxy primer which passes Slip B coefficient. Interzinc B complies with SSPC Paint 20 and contains minimum 80%. Interzinc Call for Price. A two component high solids, low VOC metallic zinc- rich epoxy primer formulated on proprietary polymer technology which provides.

Author: Nekasa Nikogar
Country: Belarus
Language: English (Spanish)
Genre: Travel
Published (Last): 8 December 2012
Pages: 460
PDF File Size: 19.69 Mb
ePub File Size: 16.68 Mb
ISBN: 809-7-66095-177-1
Downloads: 98483
Price: Free* [*Free Regsitration Required]
Uploader: Got

Retain only coating systems specified and delete all others. Company specializing in applying the work of this section with a minimum of three 3 years documented experience and certified by the manufacturer.

Interior chemical processing areas and swimming pools. Deliver materials in manufacturer’s original, sealed, undamaged container with identification label intact. Primer applied off site must be in accordance with the provisions of Section Pipes, ducts, conduits, hangers and supports, equipment, and equipment enclosures exposed to view in all rooms and spaces.

Items specified or provided with factory finish; materials and products having factory-applied primer are not considered factory finished.

Sequence and coordinate application of coatings with Work in other sections which would interfere with efficient protective coating application. Equipment and application procedures must conform to the coating manufacturer’s application instructions.

Interzinc 315

Information must demonstrate equivalence of product and performance to the specified material and complete systems. Apply approved primer to properly cleaned substrate in accordance with manufacturer’s application instructions. Protect adjacent areas from over spray of coating material.

Before proceeding with the work, the applicator will apply the interznic and finish coat to a representative substrate section of square feet in size. Surfaces Not to be Painted: Do not commence adjacent or adjoining Work until the application of the coatings is complete lnterzinc that area.

  ASTM F1798 PDF

Pipes, ducts, conduits, hangers and supports, equipment, and equipment enclosures exposed innterzinc view in all rooms and spaces except mechanical rooms, electrical rooms, and utility rooms. The application must be witnessed by the Architect’s interznic Owner’s representative and is subject to their approval.

Severe Atmosphere Application – Industrial areas with high humidity and aggressive environments. Provide a mock-up for evaluation of surface preparation techniques and application workmanship. Interior environment with high humidity and exposure to air pollution. At project closeout, provide to Owner or Owners Representative an executed copy of the manufacturer’s standard limited warranty against manufacturing defect, outlining its terms, conditions, and exclusions from coverage.

Interzonc materials in strict accordance with manufacturers documented instructions. Structural steel and framing with reference to primer receiving fire protection materials. Final color, gloss and finish will be determined and approved by the Architect.

Commencement of application is acceptance of substrate. The Manufacturer’s quality management system must be assessed and registered by an independent registrar as conforming to the requirements of ISO Grind smooth all weld spatter and defects prior to commencement of coating application.

Interzinc B – A k i r a

Moderate Atmosphere Applications – Industrial and coastal areas. Temperature and Humidity Requirements: Temporary protection and heat shall be maintained at this minimum temperature for 24 hours before, during and 24 hours after material application. Areas will be designated by the Architect. Maintain environmental conditions temperature, humidity, and ventilation within limits recommended by manufacturer for optimum results.

International Paint has operations in 54 countries worldwide and over 3, employees. Regional Materials- 20 percent extracted, processed and manufactured regionally: Steel substrate temperature shall be a minimum of 5 deg F 3 deg C above the dew point of the surrounding air for a period of 24 hours prior and during the application of the material. Requests for substitutions must be made 30 days prior to submittal and contain the full name of each product, descriptive literature, testing data collected from industry consensus standard testing, data on past performance, manufacturer’s instruction for use and generic type.

  COGNICION Y APRENDIZAJE ANIBAL PUENTE PDF

Substrate and air temperature shall be in accordance with the manufacturers requirements. Do not apply coatings under environmental conditions outside manufacturer’s absolute limits.

SECTION HIGH PERFORMANCE SPECIALTY COATINGS

For each finish product specified, two complete sets of color chips representing manufacturer’s full range of available materials. Apply material at the required dry film thickness. A copy of the transport document and manufacturers conformance certificate shall be attached to the material delivery QC form. The following is one example of how a mock-up on a large project might be specified. Store and dispose of hazardous materials, and materials contaminated by hazardous materials, in accordance with requirements of local authorities having interzinf.

Marine, offshore and coastal areas with high salinity. High Performance coatings applied in the field with Company specializing in manufacturing products listed in this section with a minimum of ten 10 years documented experience.

Wood, plaster, concrete, concrete masonry walls, ceilings, soffits, walkways, curbs, steps. Coating will be a complete system from a single source consisting of primer and topcoat. Protect work area from windblown dust and rain.